Trolltjärn

Trolltjärn

Trolltjärn Substation ; Installed Capacity 0 MW Status In Operation Ownership Transferred Substation Trolltjärn connects MB1101 – Phase 2 und Phase 3 wind farms to Svenska Kraftnät’s 400kV transmission grid. The planned grid connection capacity of 1.700 MW...
Rabäcken

Rabäcken

Rabäcken Substation ; Installed Capacity 0 MW Status In Operation Ownership Transferred Substation Rabäcken connects MB1101 – Phase 1 und Phase 3 wind farms to Svenska Kraftnät’s 400kV transmission grid. The installed grid connection capacity of 1.700 MW...
Gabrielsberget Net

Gabrielsberget Net

Gabrielsberget Net Substation ; Rated Power 0 MW Status In Operation Ownership Transferred Gabrielsberget Net AB operates the substation to connect Gabrielsberget wind farm to Vattenfall Eldistribution AB’s 130kV grid. The company was sold to an...
Dragaliden Net

Dragaliden Net

Dragaliden Net Substation ; Rated Power 0 MW Status In Operation Ownership Transferred Substation Dragaliden connects the wind farms Dragaliden and Blaliden to Vattenfall Eldistribution AB’s 130kV grid. The respective company Dragaliden Net AB was established in...