von SV_Admin | Aug. 21, 2025
Trolltjärn Substation ; Installed Capacity 0 MW Status In Operation Ownership Transferred Substation Trolltjärn connects MB1101 – Phase 2 und Phase 3 wind farms to Svenska Kraftnät’s 400kV transmission grid. The planned grid connection capacity of 1.700 MW...
von SV_Admin | Aug. 21, 2025
Rabäcken Substation ; Installed Capacity 0 MW Status In Operation Ownership Transferred Substation Rabäcken connects MB1101 – Phase 1 und Phase 3 wind farms to Svenska Kraftnät’s 400kV transmission grid. The installed grid connection capacity of 1.700 MW...
von SV_Admin | Aug. 21, 2025
Gabrielsberget Net Substation ; Rated Power 0 MW Status In Operation Ownership Transferred Gabrielsberget Net AB operates the substation to connect Gabrielsberget wind farm to Vattenfall Eldistribution AB’s 130kV grid. The company was sold to an...
von SV_Admin | Aug. 21, 2025
Dragaliden Net Substation ; Rated Power 0 MW Status In Operation Ownership Transferred Substation Dragaliden connects the wind farms Dragaliden and Blaliden to Vattenfall Eldistribution AB’s 130kV grid. The respective company Dragaliden Net AB was established in...