von SV_Admin | Aug. 21, 2025
Sandbacka Other Projects ; Number of Turbines 0 Installed Capacity 0 MW EAP 0 GWh Status In Operation Ownership Transferred Sandbacka wind farm was the first project developed and fully permitted by Svevind AB in Finland, in Ostrobothnia province. Before construction...
von SV_Admin | Aug. 20, 2025
Gabrielsberget Other Projects ; Number of Turbines 0 Installed Capacity 0 MW EAP 0 GWh Status In Operation Ownership Transferred In 2008, Svevind obtained a permit to build and operate 40 wind turbines on the plateau Gabrielsberget in the municipality of Nordmaling....
von SV_Admin | Aug. 20, 2025
Granberget Pilot Project ; Number of Turbines 0 Installed Capacity 0 MW EAP 0 GWh Status In Operation Ownership Transferred In spring 2003, Svevind was granted permission to construct six wind turbines on Granberget, north of Sikeå in the municipality of Robertfors....
von SV_Admin | Aug. 20, 2025
Latikberg Other Projects ; Number of Turbines 0 Installed Capacity 0 MW EAP 0 GWh Status In Operation Ownership Transferred In the summer of 2010, Svevind obtained a permit to build and operate a wind turbine at Latikberg in the municipality of Vilhelmina. The wind...
von SV_Admin | Aug. 20, 2025
Skäggs MB1101 - Pilot Project ; Number of Turbines 0 Installed Capacity 0 MW EAP 0 GWh Status In Operation Ownership Transferred Siral has designed and built two wind turbines at Skäggs gård, island of Gotland, on behalf of Svevind. The two turbines Vestas V-47 have...