Rated Power
0 MW
Status
In Operation
Ownership
Transferred
Substation Dragaliden connects the wind farms Dragaliden and Blaliden to Vattenfall Eldistribution AB’s 130kV grid. The respective company Dragaliden Net AB was established in 2008 by Svevind AB and later transferred to the connected wind farm companies.
