Granberget

Pilot Project

Number of Turbines

0

Installed Capacity

0 MW

EAP

0 GWh

Status

In Operation

Ownership

Transferred

In spring 2003, Svevind was granted permission to construct six wind turbines on Granberget, north of Sikeå in the municipality of Robertfors. The wind turbines manufactured by German OEM Enercon (E-82/2.0M MW) have been in operation since 2009.

This project was transferred to an investor.